Key Projects

  • Common Effluent Treatment Facility At SIDCO Pharmaceutical Complex, Alathur, Tamilnadu

funded by “Department of Pharmaceutical(DoP), Ministry of Chemicals & Fertilizers, Government of India’ is running a Cluster Development Programme for Pharma Sector(CDP-PS), in Public-Private-partnership (PPP)mode, wherein the Clusters are provided with one time grant-in-aid for developing common facilities Centres(CFCs).

Conveyance system from individual units to the CETP area, the complete CETP and the distribution system of treated water through Hydro Pneumatic System back to the individual units and conveyance of the reject from R.O. plant from the Reject Water Tank to the Oxidation Pond area in the site OF CETP of 340 KLD (2 x 170 KLD) capacity with core process of primary electrolytic treatment, followed by secondary biological, tertiary and R.O. plant and evaporator. This system is being operated and maintained by us.

  • Complete Water Resource Management Project for 7 villages and surrounding hamlets under PURA (providing urban amenities in rural areas) SCHEME of the GoI, under Ministry of Rural Development, covering more than 50 kms radius, including detailed flood mapping for the entire area, flood inundation studies, water mapping, storm water network analysis, design of new drains, detailed water safety plan, water security plan, water supply and distribution networks, sewage and sewerage network systems planning, design, engineering of water and sewage treatment plants, including drinking water supply modeling – project worked under ADB

  • Detailed study and report on Storm Water Modeling, adequacy and development of new storm water drains, including macro water shed analysis, micro water shed analysis, flood mapping and development of micro waterbodies towards maximization of harvesting and inundation prevention for 1000 acres Industrial Park, Thervoy Kandigai, (order provided through CUBE – IIT Madras and Govt of Tamilnadu.

  • Flood Impact Study and Storm Water Drain Design for Disney Asianet studios, Chandiroor, Keralaunder M.Moser Design Associates (India) Private Limited

  • Detailed study of existing storm water drain networks, identification and tagging of inadequacy, development of detailed SWD network integrating existing network and new network, detailed flood inundation study and development of flood mitigation plan for SIDCO Industrial Estate, Thirumazhisai, covering 165 acres

  • Integrated Storm Water & Flood Mapping design, including maximization of RWH and creation of micro waterbodies for 55 acres and 612 acres integrated township for Ms. Marg Ltd, @ Swarnabhoomi and Tranquil Cove,ECR, Chennai